A conceptual framework for integrating Facility Layout and Production Scheduling in Flowshop Manufacturing Cells decisions (S. Cáceres-Gelvez, M. D. Arango-Serna, & J. A. Zapata-Cortés, Trans.). (2022). Revista EIA, 19(38), 3811 pp. 1-21. https://doi.org/10.24050/reia.v19i38.1543