[1]
Fernández Salcedo, G.A. et al. trans. 2026. Material Requirements Planning Model Using Multi-Objective Mixed-Integer Linear Programming in a Bicycle Assembly Plant. Revista EIA. 23, 46 (Sep. 2026). DOI:https://doi.org/10.24050/reia.v23i46.1906.